JEBEL ALI 'D' POWER STATION

Client :
Dubai Electricity & Water Authority (DEWA)
Location:
UAE
Sector:
Infrastructure
Services:
Oil, Gas & Power , Mechanical Products ,

 

Brief Description of the Work undertaken by BEC Group

Mechanical erection works of 3 x 150 MW Gas Turbine and 320 TPH HRSG Modules.

 

Salient Features

  • Erection of 3 x 150 MW (Ansaldo / Siemens V94.2) Gas Turbine / Generator with associated Auxiliary Equipment, Fuel Oil Skid, Stack and On-base Piping involving P91, P22, P11 and carob steel materials.
  • Erection of 320 TPH HRSG Modules, Fabrication and erection of 60 metres height Exhaust Stack, Fabrication and Erection of Bypass Stacks
  • Pre-fabrication, Assembly and Erection of:

a. Air inlet system.

b. Exhaust system including ducting and stack.

c. Cooling system.

d. Online and Offline wash system.

e. Complete on-base piping.

f. Fuel gas supply.

g. Fuel oil supply.

h. Painting and Insulation of all ducting and stack.

i. Acoustic enclosure for the GTG.