/

Narrow your search by

GENERAL HOSPITAL AT SOHAR

Client :
Ministry of Health
Location:
Oman
Sector:
Healthcare
Services:
MEP ,

 

Brief Description of the Work undertaken by BEC Group

The 380 bed hospital involves Complete MEP Services for the Hospital & Accommodation Blocks for Doctors & Junior Staff.

 

Salient features:

  1. Air-conditioning System comprises of 9 Nos. Air-cooled Chillers of 190 TR capacities each
  2. Building Management System controlling / monitoring Air-conditioning system, Hot/cold water system, water tanks
  3. Specialist systems like Medical Gases, Nurse Call System, Vacuum & compressed air
  4. Kitchen & Laundry Equipment, Incinerators, Boilers including flues & chimney
  5. Standby D.G. Sets (2 x 700 KW, 1 x 450 KW) & 10 nos. UPS system
  6. 11KV Switchgear, Transformers, Ring Main Units
  7. Lighting & small power including Operation Theatre surgical panels and lighting
  8. Low Current Systems such as structured cabling, Intercom, PA/BGM, SMATV, Restricted entry system
  9. Fire Fighting & Fire alarm system
  10. Complete plumbing works including water supply, drainage etc.
  11. Water treatment & Sewage Treatment Plants
  12. Chemical waste (laboratory waste) collection system