Brief Description of the Work undertaken by BEC Group
The 380 bed hospital involves complete MEP Services for the Hospital & Accommodation Blocks for Doctors & Junior Staff.
Salient features:
Air-conditioning System comprises of 6 Nos. Air-cooled Chillers of 250 TR capacities each
Specialist systems like Medical Gases, Nurse Call System, Vacuum & compressed air.
Kitchen & Laundry Equipment, Incinerators, Boilers including flues & chimney.
Steam piping distribution network for Boilers, Calorifiers, Humidifiers.
Fire Fighting & Fire alarm system.
Standby D.G. Sets (2 x 1250 KW), 4 nos.UPS system.
11KV Switchgear, Transformers, Ring Main Units.
Operation Theatre surgical panels and lighting.
Low Current Systems such as structured cabling, Intercom, PA/ BGM, SMATV, Restricted entry system
Complete plumbing works including water supply, drainage etc.
Water treatment & Sewage Treatment Plants.
Chemical waste (laboratory waste) collection system.