Brief Description of the Work undertaken by BEC Group
Design, Engineering, Procurement, Delivery, Installation, Testing and Commissioning of 132/33kv Grid Station at Madinat Nizwa , 132Kv Outdoor Extension (2Bays) at Nizwa Grid and 12KM DC Over Head Transmission Line between Madinat Nizwa and Nizwa Grid.
Salient Features
- 132kV Gas Insulated Switchgear (8 Bays- Siemens, Germany)
- 2x125MVA,132/33kV Power Transformer (Telk, India)
- 33kV Air Insulated Switchgear (22Bays – Schneider Electric,Turkey)
- 2x315kVA,33/0.415Kv Earthing Auxiliary Transformer (Voltamp, Oman)
- Control and Protection System (Power Economy, UAE)
- Substation Control System (Siemens, Germany)
- 132kV Outdoor Equipments (Siemens, Germany)
- 132kV,1Cx2000Sqmm and 1Cx800Sqmm Cables (Phelps Dodge, Thailand)
- 132kV Cable Terminations (Tyco, Germany)
- 2x20MVAR Capacitor Banks (Power Economy, UAE)