Brief Description of the Work undertaken by BEC Group

Complete Mechanical, Electrical and Instrumentation works including commissioning assistance, for Al Aweer Gas Turbine Power Project, Dubai ‘H’ Station.

 

Salient Features
Mechanical - 

•    6 x 100 MW Gas Turbines/Generators
•    Fuel Oil and D.M. Water Storage Tanks
•    Hot tapping of Fuel Gas Line, Fuel Gas/Fuel Oil Treatment and Pumping skids
•    Fuel Gas/ Fuel Oil, Water, Air and Fire fighting
•    Complete inlet & exhaust of Gas Turbine
•    Exhaust Stack (Fabrication and erection of 6M dia and 60M high stack including insulation)
•    Firefighting system including Fire Ring Main consisting of GRE piping, Hydrants, Deluge Systems, CO2 systems etc.
•    Painting and insulation for above all systems

 

Electrical and Instrumentation - 

•    400kV GIS in-door substation
•    400kV/15/15, 140MVA Double winding Generator Transformers
•    Unit and Auxiliary Transformers
•    Local Control buildings complete with all MCCs and Local Control Panels
•    All Power, Auxiliary Power and Control Cabling (Total 1200 Kms of cabling)
•    Calibration, Erection and Field instruments and their hook-ups
•    SCADA and Communication
•    Lighting, Earthing etc.