Narrow your search by

Duqm Refinery Project EPC Package 1, Oman

Client :
Duqm Refinery and Petrochemicals Industries Company (OQ8)
Location:
Oman
Sector:
Infrastructure
Services:
Oil, Gas & Power ,
Project Consultant :
-
Project Partner :
-
Capacity:
-

Brief Description of the Work undertaken by BEC Group

MEI Works for Packages 02 & E&I works for Package 04(LCS/SAT) for Duqm Refinery project.

Contractual Scope     
•    Structural erection.

•    Piping; Flushing, Hydrostatic Testing, Leak Testing and blowing. Including testing up to commissioning.

•    Mechanical Erection including Alignment, Equipment interconnections, Internals installation, Testing, etc.

•    Electrical works: Installations including testing such as continuity tests, uncoupled runs, energizing of switchgear, etc. 

•    Telecommunication: Function tests, Calibration and Testing, etc. 

•    Instrumentation: Installations including Loop Checks, Function tests, Calibration & Testing Valves, etc.

•    Protective Coating, Insulation and Fireproofing: Painting, Coating, Wrapping & Insulation for Steel Structure, Piping, Equipment, E&I items