Brief Description of the Work undertaken by BEC Group
Steel Structural, Mechanical and Piping works for LPIC EPC-3 NGL Extraction Unit with Offsite & Utilities Project.
Contractual Scope - Mechanical (Brown & Green Field Area)
Steel Structure – Installation
• Pipe racks
• Equipment Tech structures
• Building structures
• Shelters
• Local Supports
Piping Works – Pre Fabrication and Installation
• Carbon / LTCS / Stainless steel – Heavy wall piping
Equipment’s Installation includes
• GTG Package
• WHRU Package
• Flare Package
Support – Primary and secondary support Fabrication & Installation
© Copyright 2021 Bahwan Engineering Group