Brief Description of the Work undertaken by BEC Group
Design, supply of all materials and construction for upgrading of the existing 132/33 kV Mobella -1 GS to 220 kV and connecting its 220kV System via LILO to Filaj/ Airport Height 220kV OHL including extension of existing 132kV GIS for 2 (two) Incomer bays & 132kV cable connection between 132kV Side of 500MVA Transformers and existing 132 kV GIS
Salient Features
• 220kV Indoor Gas Insulated Switchgear – 8 Bays (Hyundai, South Korea)
• 500MVA,220/132/33kV Power Autotransformers – 2 Nos (Hyundai, South Korea)
• 132Kv Gas Insulated Switchgear (Bay Extension) – 2 Bays (Hyundai, South Korea)
• 750KVA,33/0.415KV Earthing Aux. Transformers - 2 Nos (Voltamp, Oman)
• 220kV & 132kV Control Protection System (ETA-PCS , UAE)
• Telecommunication System ( ABB, Switzerland)
• Substation Control System (GE, Spain)
• 1Cx2500, 220kV Cables & 1Cx2000,132kV Cables (Taihan , South Korea)