Brief Description of the Work undertaken by BEC Group
Engineering, Procurement, Construction, Testing and commissioning of 132/33kV Grid Stations at Wadi Kabir & Al Falaj and interconnecting both Grid Station via Muttrah Grid by means of 132kV U/G Cables and Over Head Transmission Line Towers.
Salient Features
• 132kV Gas Insulated Switchgears (10 Bays & 8 Bays – Siemens, Germany)
• 125 MVA, 132/33 Power Transformer (Voltamp, Oman)
• 33kV Gas Insulated Switchgear (22Bays – Siemens, Germany)
• 3x315kVA,33/0.415Kv Earthing Auxiliary Transformer (Voltamp, Oman)
• 132kV, 2500Sqmm Enameled Copper Cables with Joints & Terminations (LS ,South Korea)
• Double Circuit Over Head Transmission Line between Muttrah and Wadi Kabir GS (2KM)
• Substation Control System, Protective Relays & Metering System (GE, Spain)
• Telecommunication System (ABB, Sweden)